Tokyo Stock Exchange Prime, 2337 Ichigo

Business Business Business

Ichigo Green Ichigo Kiryu Okuzawa ECO Power Plant

Located in Gunma Prefecture north of Tokyo, Ichigo Kiryu Okuzawa ECO Power Plant was built on the site of a former stone quarry leased from Kiryu City. With 5,334 solar panels producing a total output of 1.33 MW, the plant generates enough electricity to power 440 households.

Today's
Power Generation
kWh
Today's
CO2 Reduction
kg-CO2
Ichigo Megasolar Plants Begin Operation (10/08/2013) (322679)
  • Location Gunma Prefecture
    Area 27,588
    Operation Start Date September 30, 2013
    Power Output 1.3335MW
    Panel/Turbine Maker Toshiba
    Inverter Supplier Fuji Electric
    EPC Contractor Kokko Shisetsu Kogyo
  • Regional Overview
  • ・Culture: former center of silk textile manufacturing
    ・Architecture: sawtooth-roof textile mills, now used as shops
    ・Industries: metal, machinery
  • Kiryu City Website http://www.city.kiryu.lg.jp/index.html
    Regional Mascot
  • Kinopi, Kiryu City’s Mascot
  • kinopi.jpg