Tokyo Stock Exchange Prime, 2337 Ichigo

Business Business Business

Ichigo Ichigo Ueda Yoshidaike ECO Power Plant 67

The  Ueda Yoshidaike ECO Power Plant is built on an agricultural reservoir in Ueda City, Nagano Prefecture. With 2,136 solar panels and a total output of 1.16MW, the renewable energy plant generates power for 469 households.

Today's
Power Generation
kWh
Today's
CO2 Reduction
kg-CO2
Ichigo Ueda Yoshidaike ECO Power Plant Begins Operation (11/11/2022) (578655)
  • Location Nagano Prefecture
    Area 23,634
    Operation Start Date November 11, 2022
    Power Output 1.16MW
    Panel/Turbine Maker LONGi Solar
    Inverter Supplier HUAWEI
    EPC Contractor JFE Plant Engineering
  • Regional Overview
  • ・Located on the east side of the Chikuma River, Yoshida is a castle town that was founded by Sengoku Period lord, Masayuki Sanada.
    ・ A major producer of grapes, apples, Chinese cabbage, cabbage, and walnuts.
    ・ Major industries include manufacturing of electronic devices and auto parts.
  • Ueda City Website https://www.city.ueda.nagano.jp/
    Regional Mascot
  • Sanada Papamaru (left),
    Sanada Yukimaru (right)
    Ueda City’s mascot characters
  • 2.png